$2M General Liability Blue Stakes 811 on every dig
EN·ES
Trenching · Utah

Utility TrenchingAcross Utah

Water, sewer, septic, electrical and drainage lines trenched to code depth, bedded and backfilled properly. The part nobody sees is the part that fails — so we do it right the first time.

Takes 30 seconds · No obligation · You reach the crew, not a call center

Wolves Earthworks crew installing utility conduit in an open trench in Utah
24h
Fixed written quote
48h
On-site estimate
1yr
Written warranty
100%
Own crew, own iron
Long conduit run trenched across a Utah property Trenched
Pipe being installed in an open utility trench in Utah Pipe in
Close detail of conduit bedded in a utility trench Bedded

What's included

What You Actually Get

All of this is inside the quoted number. If something isn't in this list, we tell you before you sign — not after.

Water & sewer

Service lines to code depth and slope, so the inspector signs off the first time.

Septic

Tank excavation and drain field trenching to the approved design.

Electrical & conduit

Trenched to the depth the utility requires, with warning tape where code calls for it.

Drainage & French drains

Perforated pipe, gravel and fabric, pitched so water actually leaves.

Bedding & backfill

Sand or gravel bedding under the pipe, backfilled in lifts and compacted. Not shoveled back loose.

Blue Stakes 811

Public lines marked before we open ground. You mark anything private.

Pricing

Quoted per linear foot

Trenching prices on depth, soil, length and what has to be crossed. Rock, high water table or an existing driveway in the way all change the number — and we tell you on the site visit, not halfway through.

Get My Exact Number

How it works

Four Steps, No Surprises

1

We call you

Ten minutes to confirm the lot, the scope and the access. Same day if you reach us during business hours.

Today
2

We walk the site

Slope, soil, access and utilities. We photograph what matters and tell you what the job actually is.

Within 48 hours
3

One fixed number

In writing, with the scope spelled out. Haul-off and cleanup inside the price. It doesn't move.

Within 24 h of the visit
4

We do the work

Confirmed start date, daily progress update, and a site left clean when we pull out.

Start date in writing

Questions

Utility Trenching in Utah — Straight Answers

Below the frost line, and the exact depth is set by your local water authority and building department. It varies by city and elevation, so we dig to what your jurisdiction requires, not a rule of thumb.
Always, on every job, no exception. Blue Stakes marks public utilities. Anything you installed yourself — sprinklers, invisible fence, private water or gas lines — nobody marks but you, so tell us where they are before we start.
Sometimes. Boring under a slab or driveway avoids the demo and the repour, and it's usually cheaper than replacing concrete. Whether it works depends on soil and distance — we tell you on the site visit.
That depends on your city. Some let a licensed contractor tap the main, some require the utility to do it. We coordinate it either way and it's in the scope you sign.

Free on-site estimate

Get Your Exact Number in Writing

Tell us where the lot is and what's on it. We'll be out within 48 hours and your fixed written quote lands within 24 hours of that visit.

  • ✓ Free, no obligation, no pressure call afterwards
  • ✓ One fixed price — haul-off and cleanup included
  • ✓ We pull the permit and mark Blue Stakes
  • ✓ One-year written warranty on compaction and drainage
  • ✓ General contractors: bid in 24 h, COI in 1 h

Prefer to talk?
801-784-3687

By submitting you agree to our Privacy Policy and Terms of Service. We never sell your information.

📞 Call Now Free Estimate